RED PRIMULA User's Guide Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 76
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
C
27
5-PLUMBING CONNECTION
Technical Dept. - All rights reserved - Reproduction is prohibited
PLUMBING SYSTEM CONNECTION
IMPORTANT!
If installation of the product involves interaction with another, pre-existing system complete with heating
equipment (gas boiler, methane boiler, diesel boiler, etc.), contact qualied personnel, who subsequently will be
responsible for conformity of the system in compliance with the applicable law in force.
The Company declines all responsibility for damage to persons or things in the event of failed or incorrect operation,
if the aforementioned warnings are not complied with.
It is important that ONLY qualied engineers are used to t and commission the appliance in ALL cases. The installing
engineer MUST hold a QCF recognised biomass qualication. Any company using sub-contractors MUST ensure they also
hold the relevant qualications (ONLY FOR UK)
CONNECTION DIAGRAM FOR PRIMULA–ORCHIDEA HYDRO STOVE
A1 3/4”M heating water delivery
A2 3/4”M heating water return 3/4”M
C 3 bar 1/2” M safety valve
E 3/4”M system draining and emptying
CONNECTION DIAGRAM FOR THE PRIMULA-ORCHIDEA HYDRO STOVE EQUIPPED WITH KIT FOR DOMESTIC HOT
WATER PRODUCTION
A1 3/4”M heating water delivery
A2 3/4”M heating water return 3/4”M
C 3 bar 1/2” M safety valve
E 1/2”F system emptying
B1 Domestic hot water delivery
B2 Domestic hot water return
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 75 76

Comments to this Manuals

No comments